Sunday, 4 August 2013

Tiles finished!!!

No grout and grout - what a difference


Main bathroom


The bath is going to be huge - I can't wait


Main bathroom shower - it's tiled along way up, looks really good.

Well I worked out one problem with the showers.  The hob (which is quite chunky) is installed first before the tiling, the tiles are put down either side and at different levels which means if you want to replace the shower screen to a semi-frameless it is near impossible. This is what we were planning to do in a year or so.  I thought I was being clever and changing them later because we cut that off the colours to have something else.  But we will just cross that bridge when we come to it :)

I love my house........ 


Saturday, 3 August 2013

Tiling progress day 4

We went for our usual Saturday family look and the tiler was still there so we got to go in and have a look. I think he was still tiling around the bath frame, then he has the grouting to go for all 4 areas and he said it would be finished today, he must be having another long day at it because he works by himself.   I didn't have a total breakdown about the tiles but am a little unsure of the skirting tile being different from the floor tile (we have the floor and skirting the same in this house) but then again they are 2 different sized tiles so it would of looked weird that way too.  The top of the white tiles are grey so I'm not sure what happens there it looks crap but and a big but, I have to remind myself it's not finished ha ha and shouldn't panic..... YET!!!!!!!  He said it will look very different once the grout is done so we will be going back to have a look ASAP. 

Ensuite - where the mirrors go

Ensuite shower

Laundry

They also finished the fit off.  The skirting boards are on, the architraves around the windows and my pantry doors, one word "beautiful"


The big handles still need to be put on


Some useless git ran into the wall near the fridge and then around the corner near the linen cupboard, have no idea what with but they sure took a chunk out. 

Wednesday, 31 July 2013

Wet area tiling

I went and met the tiler on-site yesterday to check the tiles, grout and grates, I'm pretty sure it was what we picked.  The floor tiles are ceramic tiles Fidama Ash 330x330 and the wall tiles are Tempo Ice 330x500 laid horizontal.  Our SS was there as well and gave me an update on what's happening and what's booked in next.  It's great to have a SS that's so on the ball and positive about the build and MJH. 

Today is my birthday, my kids took me for afternoon tea and then we thought we would go and have a sneak peek at the house.  The tiler was still working at 4pm so we got to go and have a look. He had levelled all the floors, I didn't realise what went into tiling the wet areas.  He had tiled the ensuite and just about finished the main bathroom. I got a picture of the ensuite and I really like the tiles and now you can se how big it really is.


The skiting boards and other Lin 1 doors aren't on yet, maybe they are waiting for the tiling to finish now.  All the power points and holes for the lights have been cut out, we are booked in for painting next week, fingers crossed.

I got the plans for the house that is being built on the block behind us, its a MJH of course but not the same as ours and I'm very happy it's single story, not that it's close to us really only 37m away ha ha.  Hoping we will still be able to see the little mountain still from our back doors.  It will be good to have some neighbours even though the boys had decided their block was the cricket pitch and the block next to us is their footy field.

Monday, 29 July 2013

Tiles

We are slowly getting organised. We went and picked out some tiles on Saturday, we choose 3 we liked for inside and 1 for the alfresco area and front porch.  They are 600x600 Porcelain, we picked 2 that were white/cream colour and then a darker one just to see.  The one for outside is really dark to match the woodland grey stacker doors. 


We all picked the one on the right - Beige/Grey Swirl Sandstone Look





600x600 Swirl Lead Rockface Porcelain Tile
 

Sunday, 28 July 2013

Kitchen = excitement plus

The kitchen is in!!!!!!!  The kitchen was delivered on Monday and installed on Tuesday and Wednesday, they also put in the 2m laundry cupboard and the 3 vanities.

We went to the house on Tuesday arvo and peeked through the windows and the ensuite vanity was in the main bedroom and its so long, we won't know ourselves with all the storage.  The laundry cupboard was installed and my first impression was yuck!!!!  I didn't like the colours i picked one bit, I was beside myself all night :(. The kitchen was only half done by then.

I sent our SS a txt to ask if we could meet him at 7.30am to have a look on Thursday morning, which we did.  The kitchen was finished (without the bench-tops and splash back) and looks great, thank god we copied off the display home and I didn't pick it haha. I had a good look at the laundry and it wasn't too bad in the end, I wish I had just got white cupboards.  Our vanities are the same colour as the laundry cupboards but with a different top (thank god)!

Kitchen upgrades & colours:

Cupboards - Polytec Createc Cafe Cream

2 banks of drawers with soft closer either side of oven

Benchtop - Essastone Macchiato 40mm

Glass splash back - Half Oilskin

Pantry - 2 Lin1 doors




Handles - they are the same size I was just to lazy to bend down level with the drawers

The laundry cupboard

Doors - malt
Bench-top Expresso Fabrini



The skirting isn't finished yet as they are waiting for a couple of the Lin1 Doors, pantry and powder room, then they should come and finish it all off.  Our garage door isn't on because when they came to do it the poor things got confused because one side of the garage is gyprocked (remember the workshop debacle) and they didn't know how to make it level so now they need to come back, problem solving is obviously not one of their strong points.  But these things aren't holding us up, the can all be there at the same time if need be.

The tilers are booked for Monday and our Ss said they should call me to go meet them and check the colour of the tiles and grout.  



Saturday, 20 July 2013

Lock up!!!!!

All locked up!!!  The external doors are on and the front door, the big arse door with the lock I'm not coordinated to use is in.    All the internal doors and wardrobe doors are in including the $$$$ media room doors, I had to look through the back door to see them but they look pretty good.  They seem to only have the architraves to go.   


I went to get carpet samples yesterday, I knew what type of carpet because we only redid our house 2 years ago and it is brilliant, there is not a mark on it and when you vacuum it comes up like new, I just wanted a different shade.  I toyed with the idea of charcoal but its just to dark and cold for me, the lady helped me to pick so here is what I choose;


 I have laid the samples on top of the carpet we got 2 years ago, we all chose the carpet on the left except the kitten he kept on sitting on the darker one ha ha. Feel free to give your thoughts. 

While I was there I found a bed, king size that I quite like although it may be a little over the top!!


And of course I have to have the blanket box and the chaise lounge


I just need to measure and see if it will fit under the bedroom window 


We need to go and order our tiles next, apparently the price of flooring is going up so I want to get them before that happens.

Next week should be the kitchen getting installed, yayyyy!!! 

Wednesday, 17 July 2013

Little bits & pieces

I went for a look at the house today, I needed some inspiration to get me through the week.  After spending last week living it up in Melbourne and now back at work I need something to keep me going. But I try not to go there more than twice a week otherwise you just end up being disappointed if nothing is done. 

First things I noticed today were the Downpipes were all installed, wow there are so many of them, only one I don't like the position of is the one down the wall of the dreaded workshop, I knew it was going there from the plans but I suppose it doesn't really matter, they had to put it there.  

The downpipes will be painted woodland grey so will blend into the bricks like the windows 


 4 downpipes along the side of the house :)


The cornices are all finished and they look good, very nice job.  I loooovvveee the fancy one in the front entry ......

Front entry


Drop down ceiling in the kitchen 

 Kitchen, Family & Dining (I'm standing in the dining) and the other room is the media room 


And the waterproofing has been done in the bathrooms and laundry

Ensuite
Ensuite shower

Main bathroom, I didn't take one of the powder room but its really not that exciting :)

So that's the progress so far!! The fit out of the doors should be done by the end of the week and then I think our SS said the Kitchen would be in next week and then the tiling, so exciting.......